Orange City Council is seeking tenders from appropriately experienced contractors to upgrade sewer mains in three locations in Orange.
Council said it has identified three gravity sewer main areas that require upgrading due to further development and population growth, as well as providing a level of redundancy for any future developments that may impact the existing networks.
These works will take place in three locations within Orange NSW:
Pineridge Drive
These works will require the upsizing of the existing 150mm UPVC sewer main to 225mm using PN12.5 280mm OD PE pipe (cream stripe). The existing main is approximately 114m in length. This section of main will also require the rehabilitation of three existing sewer manholes.
Northern Distributor Road and Burrendong Way
These works will require the upsizing of the existing 150mm UPVC sewer main to 225mm using PN12.5 280mm OD PE pipe (cream stripe). The existing main is approximately 519m in length. This section of main will also require the rehabilitation of 13 existing sewer manholes.
Moresby Street
These works will require the upsizing of the existing 100mm VC sewer main to 150mm PN12.5 180mm OD PE pipe (cream stripe). The existing main is approximately 432m in length. This section of main will also require the rehabilitation of seven existing sewer manholes, as well as the reconnection of 27 residential connections, with junctions to be installed.
Details available on Tenderlink.